Kedron Brook Bikeway / Jim Soorley Bikeway / Boondall Wetlands Bikeway / Gateway North Bikeway / Deagon Deviation Bikeway / North Brisbane Bikeway
Across the northside of Brisbane there are a number of dedicated key bikeways that are the arteries for cycling safely to/from work, for leisure, to/from shopping complexes and businesses and for fitness/training. These bikeways being the Deagon Deviation Bikeway (DDB), the yet to be completed Gateway Bikeway (linking the Jim Soorley Bikeway to the Deagon Deviation Bikeway), the Boondal Wetlands Bikeway, the Jim Soorley Bikeway (JSB) and the Kedron Brook Bikeway (KBB).
The main purpose for this page is to include all the individual events across all the main bikeways into one single page along with including small miscellaneous updates which might not warrant its own project page such as signage/way-path updates, flooding events, temporary closures, hazards, consistent issues etc.
2017-05-18: Jim Soorley Bikeway
2017-05-18: Gateway Bikeway
2017-05-16: Brisbane North Bikeway
A contractors vehicle blocking the inbound lane of the North Brisbane Bikeway under Bowen Bridge Road at Herston during morning peak hour. Said contractor had a few choice words to say to the first cyclist who asked him about his parking location.
A short time later another cyclist heading to the city during the morning rush had submitted another photo of the same contractor now in the process of relocating his vehicle off the bikeway.
2017-05-15: Jim Soorely Bikeway
2017-05-12: Jim Soorely Bikeway
2017-05-12: Gateway Bikeway
2017-05-09: Kedron Brook Bikeway Signage at Toombul
2017-04-21: Shaw Road Intersection Upgrade Announced for Kedron Brook Bikeway
Flooding on the Kedron Brook Bikeway on Shaw Road.
Flooding on the Kedron Brook Bikeway on Shaw Road.
Flooding on the Kedron Brook Bikeway on Shaw Road.
Flooding on the Kedron Brook Bikeway on Shaw Road.
Flooding on Nundah Criterium track/start of the Jim Soorley bikeway.
Flooding on Nundah Criterium track/start of the Jim Soorley bikeway.
Flooding on Nundah Criterium track/start of the Jim Soorley bikeway.
Flooding on Nundah Criterium track/start of the Jim Soorley bikeway.
Flooding on the Jim Soorley bikeway.
Flooding on the Jim Soorley bikeway.
Flood waters on the Kedron Brook Bikeway underneath the railway line at Toombul.
Parts of the Boondal Wetlands Bikeway had water over the pathway.
Flood water over 1m deep blocking the Jim Soorely Bikeway underneath Southern Cross drive. This is the worst section to flood as it means a ~6km detour to get to the previous exit near the Nudgee Golf Club on Nudgee road.
Water over the Jim Soorely bikeway and the Nundah criterium circuit.
Water over the Jim Soorely bikeway and the Nundah criterium circuit.
After the water level dropped a car that had driven into floodwater near the toombul shopping center was washed down towards the Nundah Criterium circuit. They keys were still in the ignition
A few days after the removal of the painted bike logos half the painted green section was removed.ted bike symbols from the Kedron Brook Bikeway near 5th Ave.
Shaw Road bike lane prior to road resurfacing works
Removed road markings on a freshly resurfaced shaw road showing where the old bike lane was
Lack of signage to motorists warning them that they are exiting across a very busy and popular Kedron Brook Bikeway.
2016-07-30: Kedron Brook Bikeway – Wavell Heights
Council construction site offices return to finish off the uncompleted and delayed section of the 5th Ave to Shaw Road duplication and resurfacing works on the Kedron Brook Bikeway.
2016-07-20: Uxbridge Street to Shaw Road Pedestrian/Bikeway Upgrade
2016-07-09: Gateway North Upgrade Project/Deagon Deviation Bikeway – Detour Work
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The new shared pedestrian pathway through Boondall Railway Station
The closed section of bikeway between Boondall and North Boondall Railway stations. Signage is slightly confusing and some cyclists are still getting caught out by it.
The closed section of bikeway between Boondall and North Boondall Railway stations. Signage is slightly confusing and some cyclists are still getting caught out by it.
Bikeway signage
Bikeway signage
The gateway motorway off ramp and the Boondall Wetlands.
Modifications to the bridge over Bicentennial Road
Modifications to the bridge over Bicentennial Road
Modifications to the bridge over Bicentennial Road
Modifications to the bridge over Bicentennial Road
Modifications to the bridge over Bicentennial Road
Bikeway signage
Bikeway signage
Bikeway signage. Cyclists are focused on the corner and not the signage in the middle of the corner. Also the approach to the new pathway confuses some into thinking its just another section of bikeway rather than the detour to Deagon.
Bikeway signage
Road infrastructure for protecting cyclists/pedestrians crossing the road at the Boondall wetlands.
Road infrastructure for protecting cyclists/pedestrians crossing the road at the Boondall wetlands.
Road infrastructure for protecting cyclists/pedestrians crossing the road at the Boondall wetlands.
Road infrastructure for protecting cyclists/pedestrians crossing the road at the Boondall wetlands.
Modifications to the bridge over Sandgate Road
Modifications to the bridge over Sandgate Road
Sandgate Road
Modifications to the bridge over SandgateRoad
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
The Deagon Racecourse part of the upgrade works
2016-07-07: Gateway Bikeway Nudgee
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Nudgee Road works as part of the Gateway Upgrade North Project.
Nudgee Road works as part of the Gateway Upgrade North Project.
Nudgee Road offramp works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
Childs Road works as part of the Gateway Upgrade North Project.
2016-06-03: Gateway Bikeway Boondall
The entrance to the temporary bikeway from the Boondall Wetlands to Deagon
2016-06-01: Gateway Bikeway Boondall
Earthworks progressing on the temporary bikeway from the Boondall Wetlands to Deagon
Earthworks progressing on the temporary bikeway from the Boondall Wetlands to Deagon
Detour distance signage and the detour pathway installed
6 moths after the new section of pathway was opened it was ripped up by Brisbane City Council and replaced with a similar narrow pathway a few meters to its right..
6 moths after the new section of pathway was opened it was ripped up by Brisbane City Council and replaced with a similar narrow pathway a few meters to its right..
6 moths after the new section of pathway was opened it was ripped up by Brisbane City Council and replaced with a similar narrow pathway a few meters to its right..
2016-05-12:
A cycling exit ramp off Nudgee Road onto the bikeway
Earthworks progressing on the temporary bikeway from the Boondall Wetlands to Deagon
2016-04-02: Jim Soorely Bikeway – Nudgee
Cars parking on the footpath outside the Jim Soorley bikeway. This causes several conflicts between pedestrians and cyclists despite the available area due to the lose gravel, the banana bars, the lack of visability and the speeds at which cyclists take the corner.
2016-04-02
Part of the new tempoary shared pathway at the Boondall Wetlands on Bicentennial Road.
Part of the new tempoary shared pathway at the Boondall Wetlands on Bicentennial Road.
Part of the new tempoary shared pathway at the Boondall Wetlands on Bicentennial Road.
Part of the new tempoary shared pathway at the Boondall Wetlands on Bicentennial Road.
Part of the new tempoary shared pathway at the Boondall Wetlands on Bicentennial Road.
Part of the new tempoary shared pathway at the Boondall Wetlands on Bicentennial Road.
Part of the new tempoary shared pathway at the Boondall Wetlands on Bicentennial Road.
Part of the new tempoary shared pathway at the Boondall Wetlands on Bicentennial Road.
Part of the new tempoary shared pathway at the Boondall Wetlands on Bicentennial Road.
Part of the new tempoary shared pathway at the Boondall Wetlands on Bicentennial Road.
The bikeway under the Gateway Motorway on Bicentennial Road.
The bikeway under the Gateway Motorway on Bicentennial Road.
The bikeway under the Gateway Motorway on Bicentennial Road.
The bikeway under the Gateway Motorway on Bicentennial Road.
The bikeway under the Gateway Motorway on Bicentennial Road.
A sign set up to advise cyclists about delays. Only problem being its not visible to cyclists as they are riding past.
The sign is just visible when looking directly at it.
The sign is just visible when looking directly at it.
A sign set up to advise cyclists about delays. Only problem being its not visible to cyclists as they are riding past.
A sign set up to advise cyclists about delays. Only problem being its not visible to cyclists as they are riding past.
2016-03-22:
2016-03-15
Removal of the barriers citybound along Sandgate Road.
Removal of the barriers citybound along Sandgate Road.
Removal of the barriers citybound along Sandgate Road.
Nudgee Road overlooking the Gateway Motorway with the new bridge over the Gateway being constructed in the background.
Site offices being installed next to the Gateway Motorway on Bicentennial Road.
Site offices being installed next to the Gateway Motorway on Bicentennial Road.
Site offices being installed next to the Gateway Motorway on Bicentennial Road.
Where the bikeway will merge with the current bikeway on Bicentennial Road.
Bikeway details during construction works.
Holes drilled into the side of the Gateway Overpass with off cuts of rebar and drilled out cement below.
Debris left on the pathway.
Debris left on the pathway.
Debris left on the pathway.
Gateway Motorway works on Bicentennial Road.
Gateway Motorway works on Bicentennial Road.
Gateway Motorway works on Bicentennial Road.
Gateway Motorway works on Bicentennial Road.
Gateway Motorway works on Bicentennial Road.
Gateway Motorway works on Bicentennial Road.
Gateway Motorway works on Bicentennial Road.
The new section of commuter car parking for North Boondall railway station.
Plans for North Boondall Railway Station carpark.
Plans for North Boondall Railway Station carpark.
North Boondall Railway Station Carpark.
North Boondall Railway Station Carpark.
Covered signage at the North Boondall Railway Station exit onto Sandgate Road.
North Boondall Railway Station Carpark.
Removal of railway powerline covers
New works undertaken by Queensland Rail in preparation for works undertaken during the Gateway North Upgrade.
Construction site entry/exit to North Boondall railway station car park on Sandgate Road.
North Boondall Railway Station Carpark looking where the new bikeway bridge will be constructed.
The workside entrance, Sandgate Road and the shared pedestrian pathway.
Cyclist dismount signage.
New and unused road.
The road shoulder.
The safe space for cyclists isn’t very safe.
Gateway Motorway works on Sandgate Road at North Boondall Railway Station.
The pathway that will be shared by cyclists, pedestrians and commuters that park at the far end of the North Boondall station carpark.
Confusing signage for cyclists with the cycling ‘off ramp’ being located at the end of the guard rail.
The safe space for cyclists isn’t very safe.
What cyclists see approaching the construction works heading towards Brisbane. A small unreadable sign saying ‘Narrow Shoulder Ahead’.
What cyclists see approaching the construction works heading towards Brisbane. Just after the bridge a second and more confusing sign appears. Is it advising cyclists distances to the start or the ends. This is one area we would like to see more of a speed recuction instead of the current 10 kph off (70kph zone).
What cyclists see approaching the construction works heading towards Brisbane. At the end of a guard rail is a quick off ramp onto a narrow footpath.
The space provided for cyclists while a barrier blocks the bit of usable road.
Works being undertaken on the Boondall onramp side.
Works being undertaken on the Boondall onramp side.
Works being undertaken on the Boondall onramp side.
Works being undertaken on the Boondall onramp side.
Works being undertaken on the Boondall onramp side.
Powerline mods along the Gateway Motorway showing the future alignment of the motorway and bikeway.
Powerline mods along the Gateway Motorway showing the future alignment of the motorway and bikeway.
Powerline mods along the Gateway Motorway showing the future alignment of the motorway and bikeway.
Powerline mods along the Gateway Motorway showing the future alignment of the motorway and bikeway.
Powerline mods along the Gateway Motorway showing the future alignment of the motorway and bikeway.
Powerline mods along the Gateway Motorway showing the future alignment of the motorway and bikeway.
The construction site for the new Nudgee Road Bridge over the Gateway Motorway.
Land clearing works for the new Nudgee Road Bridge over the Gateway Motorway.
Land clearing works for the new Nudgee Road Bridge over the Gateway Motorway.
Looking where the new Nudgee Road overpass will pass over the Gateway Motorway.Land clearing works for the new Nudgee Road Bridge over the Gateway Motorway.
The existing shared pathway linking Earnshaw Road to Childs Road
Childs Road looking towards where the works for the new Nudgee Road bridge over the Gateway Motorway will be located.
The existing shared pathway linking Earnshaw Road to Childs Road
The existing shared pathway linking Earnshaw Road to Childs Road
The existing shared pathway linking Earnshaw Road to Childs Road
Looking at Earnshaw Road from the existing shared pathway linking Earnshaw Road to Childs Road
2016-02-22:
2015-12-18: Uxbridge Street to Shaw Road Pedestrian/Bikeway Upgrade
The bikeway halfway completed point (Video via Youtube)
2015-12-08: Shaw Road Pedestrian/Bikeway Upgrade
2015-12-08: Diggers Drive Pedestrian/Bikeway Upgrade at Kalinga Park
2015-11-26: Diggers Drive Pedestrian/Bikeway Upgrade at Kalinga Park
2015-11-14: Uxbridge Street to Shaw Road Pedestrian/Bikeway Upgrade
The first of the pathways to be constructed
The first of the pathways to be constructed
The pathway marked out on the grass
The project area
2015-11-14: Shaw Road Pedestrian/Bikeway Upgrade
2015-11-14: Diggers Drive Pedestrian/Bikeway Upgrade at Kalinga Park
Another motor vehicle parking on the Kedron Brook Bikeway section of Shaw Road.
2015-11-04: Diggers Drive Pedestrian/Bikeway Upgrade at Kalinga Park
2015-10-31: Car Almost Hits Cyclist on Kedron Brook Bikeway next to Shaw Road.
2015-10-30: Diggers Drive Pedestrian/Bikeway Upgrade at Kalinga Park
2015-10-22: Kedron Brook Bikeway – Lutyche
TMR surveyors on the Lutyche section of the Kedron Brook Bikeway.
2015-10-21: Kedron Brook Bikeway Lighting
Completed lighting between Montrose Street and Thistle Street.
Completed lighting between Montrose Street and Thistle Street. If you look closely at the bridge you can see the darkness of the unlit section between Thistle Street and Gympie Road.
2015-10-17: Uxbridge Street to Shaw Road Pedestrian/Bikeway Upgrade
The project site cordened off
2015-09-26: Uxbridge Street to Shaw Road Pedestrian/Bikeway Upgrade
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
Photos of the project area before construction started
2015-09-26: Shaw Road Pedestrian/Bikeway Upgrade
2015-09-26: Diggers Drive Pedestrian/Bikeway Upgrade at Kalinga Park
2015-05-01: Kedron Brook Bikeway – Toombul Shopping Center
2015-02-27: Kedron Brook Bikeway Lighting Issues
25 days later and the lights underneath Gympie Road and to the north along the Kedron Brook Bikeway are still not operational at night.
25 days later and the lights underneath Gympie Road and to the north along the Kedron Brook Bikeway are still not operational at night.
2015-02-21: Jim Soorely Bikeway / Nundah Criterium Circuit
2015-02-02: Kedron Brook Bikeway Lighting Issues
The lights on the Kedron Brook Bikeway are very random in nature as to their operational status. The lights on the southern end of Gympie Road were working however the light underneath and to the north of Gympie Road were not on.
2015-01-20: Kedron Brook Bikeway Grange
The varying widths of the Kedron Brook Bikeway westbound of Webster Road.
Built up debris constantly litters the path with cyclists choosing narrow and particular lines.
Built up debris constantly litters the path with cyclists choosing narrow and particular lines.
The varying widths of the Kedron Brook Bikeway westbound of Webster Road.
The varying widths of the Kedron Brook Bikeway westbound of Webster Road.
The varying widths of the Kedron Brook Bikeway westbound of Webster Road.
The varying widths of the Kedron Brook Bikeway westbound of Webster Road.
The varying widths of the Kedron Brook Bikeway westbound of Webster Road.
A single vehicle crash on Shaw Road next to the pedestrian/bikeway crossing. The area was busy at the time due to local sporting events being on at multiple fields. A passerby stated that the car drifted along the end of the bike lane before striking the bridge.
2013-05-30: Kedron Brook Bikeway – Kedron
Water laps at the top of a bridge on the Kedron Brook Bikeway. The majority of the bikeway remained unflooded however creek crossings at Arana Hills, Stafford, Grange and Kedron paralyzed large sections of the bikeway.
2013-05-17: Kedron Brook Bikeway – Toombul
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
Damaged sustained to the Kedron Brook Bikeway at Toombul from the 27th January 2013 storms. To date there has been no repair work undertaken from either the Brisbane City Council or Airport Link contractors.
2013-03-02: Kedron Brook Bikeway – Arana Hills
The Kedron Brook Bikeway is once again cut off near the Arana Hills football club due to flooding. This is the second time in a matter of days that heavy rainfall has cut the bikeway at several locations.
2013-01-30: Jim Soorely Bikeway / Kedron Brook Bikeway
2013-01-28: Jim Soorely Bikeway / Kedron Brook Bikeway
Damaged sustained to the Toombul section of the Kedron Brook Bikeway.
Damaged sustained to the Toombul section of the Kedron Brook Bikeway.
Damaged sustained to the Toombul section of the Kedron Brook Bikeway.
Damaged sustained to the Toombul section of the Kedron Brook Bikeway.
Damaged sustained to the Toombul section of the Kedron Brook Bikeway.
Damaged sustained to the Toombul section of the Kedron Brook Bikeway.
Damaged sustained to the Toombul section of the Kedron Brook Bikeway.
Damaged sustained to the Toombul section of the Kedron Brook Bikeway.
Damaged sustained to the Toombul section of the Kedron Brook Bikeway.
Damaged sustained to the Toombul section of the Kedron Brook Bikeway.
Debris along the Boondal Wetlands Bikeway.
Debris along the Boondal Wetlands Bikeway.
Debris along the Boondal Wetlands Bikeway.
Debris along the Boondal Wetlands Bikeway.
Debris along the Boondal Wetlands Bikeway.
Water draining next to the Jim Soorley Bikeway.
Debris on the Jim Soorley bikeway.
Somehow a TV washed up next to the Jim Soorley Bikeway. The Kedroon Brook Creek can be seen behind.
2013-01-27: Jim Soorely Bikeway / Kedron Brook Bikeway
2012-09-16: Sandgate To 5th Ave via Kedron Brook Bikeway
2012-09-07: Swinburne Street To Sandgate Road via Kedron Brook Bikeway
A newly resurfaced section of the Kedron Brook Bikeway at Lutyche.
The old bumpy surface of the Kedron Brook Bikeway. This will be the last section to be resurfaced and duplicated.
The old bumpy surface of the Kedron Brook Bikeway. This will be the last section to be resurfaced and duplicated.
2012-04-12: Jim Soorely Bikeway
The bikeway before it was moved to the right due to erosion from the Kedron Brook Creek on the left