Brisbane North BUG

Brisbane North Bicycle Users Group

  • Home
  • Infrastructure Projects
    • Bridge St/Dickson Street – Immediate Safety Concerns, Request For Action
    • Brisbane North Bikeway
      • Airport Link Path (“The Toxic Path”)
      • Bridge Street/Dickson Street from Rigby Street to Price Street (Stage 4: Subject To Funding – No Known Completion Date)
      • Grove Street to Rigby Street (NBB Stage 3B and 3C)
      • McDonald Road (NBB Stage 2)
      • O’Connell Terrace to Campbell Street
      • Roma Street Overpass
      • Roma Street Parklands To Gilchrist Avenue
      • “The Ekka Ride” (NBB Stage 1A-Section 1)
      • Bowen Park to O’Connell Terrace (Stage 1A-2: Completed May 2016)
      • Federation Street to Somerset Street (NBB Stage 1B)
      • Mawarra Street (NBB Stage 3A)
    • Gateway North Upgrade Project
    • Jim Soorley Bikeway: Bridge Closure
    • Kedron Brook Bikeway / Jim Sorely Bikeway / Boondal Wetlands Bikeway / Gateway North Bikeway / Deagon Deviation Bikeway / North Brisbane Bikeway
    • Kedron Brook Bikeway Upgrades
      • Shaw Road Sports Precinct Access Road Intersection Upgrade
      • Sandgate Road to Stanworth Road (Kedron Brook Bikeway + Jim Soorley Bikeway + Boondall Wetlands Cycleway)
      • Montrose Street to Sandgate Road
        • Airport Link/Gympie Road Upgrade at Kedron (Completed)
        • Diggers Drive Pedestrian/Bikeway Upgrade at Kalinga Park (Stage 02: Completed)
        • Diggers Drive Pedestrian/Bikeway Upgrade at Kalinga Park (Stage 03: Completed November 2015)
        • Diggers Drive Pedestrian/Bikeway Upgrade from North Coast Railway Line to Kalinga Park (Stage 01: Completed)
        • Shaw Road Pedestrian/Bikeway Upgrade
        • Uxbridge Street to Shaw Road Pedestrian/Bikeway Upgrade
      • South Pine Road to Montrose Street
        • Shand Street Pathway Extension
        • Stafford City To Shand Street/Royal Parade Extension
      • Arana Hills to South Pine Road
    • Moreton Bay Railway Line And Shared Pathway Network (Petrie-Kippa Ring)
    • Robinson Road Open Level Crossing Replacement
    • Roghan Road and Muller Road Intersection Upgrade
    • Story Bridge To Fortitude Valley Bikeway
    • Telegraph Road Corridor Upgrade
      • Stage 1A: Telegraph Road Open Level Crossing Replacement
      • Stage 1B: Norris Road To Mustang Street
      • Stage 2: Undefined. Mustang Street to Deagon Deviation/Gateway
    • Western Brisbane Transport Network Strategy
    • Zillman Road and Gerler Road Intersection Upgrade
  • Membership / Join / Contact Us
  • Space4CyclingBNE
Jim Soorley Bikeway: Bridge Closure

Jim Soorley Bikeway: Bridge Closure

  • Over the last few weeks we have seen an explosion in the number of people using bikes and riding along what people feel are safe pathways, especially the Kedron Brook and Jim Soorley bikeways. Unfortunately one of the bridges on the Jim Soorley Bikeway between Nudgee Road at Nundah and the new Gateway path will be shut for most of May. The suggested detour is via Nudgee Road.

Read More

@ Powered By WordPress